AION Implementation Plan
AION Implementation Plan
Date: 2026-03-08
Starting Point
Note: the originally referenced PDF AION_Gesamtpaket_Patrick_Wirth.pdf was not
directly readable in this session because the referenced D: drive is not
currently mounted. This plan is therefore based on the existing repository, the
architecture files under docs/, and the current MVP state in the monorepo.
Current Project State
Already available:
- monorepo with
apps/web,apps/api,apps/worker, and shared packages - Next.js web app with routes for dashboard, journal, diary, notes, goals, analysis, mirror, growth, notifications, governance, privacy, and security
- NestJS API with module boundaries for the core product, governance, privacy, consent, audit, and security
- Prisma schema for users, capture, goals, notifications, governance, privacy, security, audit, and AI-related data
- deterministic AI orchestration for analysis, mirror, growth, memory, and quantum lens
- visible governance, privacy, and security surfaces
- testing baseline with API tests, Vitest, and Playwright smoke tests
Still open or only partially implemented:
- external LLM integration
- embeddings and retrieval pipeline
- worker-based background jobs
- real notification delivery
- executable export and deletion flows
- replacement of remaining in-memory logic with Prisma repositories
- real security heuristics instead of simulations
- full implementation of browser, voice, media, and collaboration features
Target State
The target is a production-ready AION MVP platform with:
- stable persistence instead of volatile runtime data
- a reliable AI pipeline with governance enforcement
- traceable privacy, consent, and security execution
- clearly separated release slices for MVP, beta, and expansion phases
Implementation Phases
Phase 0: Finalize Requirements
Goal:
- recover the PDF content or make drive
D:available again - map the PDF requirements against the repository state
- define epics, must-have criteria, and non-goals conclusively
Work packages:
- extract the PDF into backlog entries
- compare existing features with documented requirements
- create a gap list with priorities
MVP,Beta, andLater
Result:
- a reliable scope document as the single source of truth
Phase 1: Harden the Development and Runtime Foundation
Goal:
- reproducible local and later staging environments
Work packages:
- standardize Node 24, pnpm 10, PostgreSQL 16, and Redis 7
- ensure
node,pnpm, andgitare available cleanly inPATH - standardize
.envhandling and secret management - document Docker and local fallback setups
- verify start, build, lint, and test paths on a fresh machine
Result:
- every developer can start and test the system reproducibly
Phase 2: Finish Persistence Consistently
Goal:
- move all core modules to Prisma-backed persistence
Work packages:
- identify all remaining in-memory services
- introduce repository layers per domain
- keep controller interfaces stable and replace only service implementations
- secure migrations, seeds, and data validation per domain
- move API tests to persistent paths
Priority:
- journal
- diary
- notes
- goals
- notifications
- memory
- analysis, mirror, and growth
Result:
- no critical user data remains only in memory
Phase 3: Make AI Orchestration Production-Ready
Goal:
- move from deterministic rules toward controlled provider integration
Work packages:
- add provider adapters for external LLMs
- make prompt versioning in
packages/promptsruntime-capable - build a retrieval pipeline with persistent memory
- move embedding generation into the worker
- audit governance decisions before and after model calls
- define fallbacks when providers fail or governance blocks execution
Result:
- real AI outputs with traceable policy enforcement
Phase 4: Complete Background Jobs and Notifications
Goal:
- introduce asynchronous and deliverable system processes
Work packages:
- use a Redis-based queue for background jobs
- define notification jobs, retries, and dead-letter handling
- implement mail delivery or provider integration for incident and reminder emails
- prepare push or in-app realtime later in a clean way
- add observability for failed jobs
Result:
- reminders, security alerts, and export processes no longer rely only on stubs
Phase 5: Operationalize Privacy, Consent, and Security
Goal:
- move trust-related areas from demo visibility to real execution
Work packages:
- implement export requests as real data export
- implement deletion requests with status flow and deadlines
- connect consent changes in a revision-safe way
- extend incident detection from simulation toward real heuristics
- optionally prepare 2FA, device trust, and session hardening
- connect privacy, security, and audit events across modules
Result:
- governance, privacy, and security become operational product functions
Phase 6: Refine the Frontend for Productive User Flows
Goal:
- turn the current routes into clean end-to-end product experiences
Work packages:
- distinguish placeholder areas from truly mature functionality
- unify API errors, loading states, and empty states consistently
- prioritize core flows: capture, goals, notifications, analysis, governance, privacy, and security
- gate unfinished areas like
browser,voice, andmediawith feature flags or roadmap guidance - improve UX for privacy, governance, and incident communication in a trustable way
Result:
- a consistent, credible, and release-ready user interface
Phase 7: Quality Assurance and Release Process
Goal:
- establish reliable technical release criteria
Work packages:
- focus unit, integration, and E2E coverage on critical flows
- introduce contract tests between web, API, and shared packages
- build a test matrix for governance blocking, privacy requests, and security incidents
- define a release checklist for migrations, seeds, background jobs, and audit trails
- validate runbooks for backup, incident response, and rollback
Result:
- each release can be approved with technical and functional traceability
Recommended Release Slices
Release 1: Stable MVP
Scope:
- capture, goals, notifications
- governance, privacy, and security centers
- persistent core modules
- deterministic AI functions
Not included:
- external LLMs
- real embeddings
- voice, media, browser
Release 2: Intelligent Beta
Scope:
- external model providers
- retrieval and memory context
- worker-based jobs
- real notification delivery
- operational privacy and incident workflows
Release 3: Expansion Phase
Scope:
- browser
- voice
- media
- collaboration
- expanded security and trust functions
Critical Risks
- the document state and repository state may diverge as long as the PDF is not revalidated
- remaining in-memory logic can cause inconsistent behavior across restarts
- external AI providers without clean policy and audit chains would undermine the trust model
- privacy and security stubs may appear product-ready while still being only partially reliable
- unclear prioritization of side modules endangers MVP focus
Recommended Next Steps
- Make the PDF accessible again and validate the requirements against this plan.
- Start Phase 1 and Phase 2 as the immediate sprint block.
- Turn all remaining in-memory modules into a prioritized persistence list.
- Create a separate epic track for AI providers, embeddings, and worker expansion.
- Treat privacy, security, and governance functions as production-critical tracks, not as later decoration.